(1) on the chicken manure dryer base processing, based on the anchor bolt hole, into vertical and horizontal centerline, for installation and alignment. Support device installation must be based on concrete strength of 75% or more. (2) to make the cylinder after installation tilt meets the requirements, mainly guarantee the accuracy of the high and low two roller base foundation elevation difference, (3) the base installation after accurate find is to satisfy the following requirements:
The error must not exceed 2 mm between the cross center line of the wheel base and design center line or center elevation . Two longitudinal center line of the base must be in a straight line, the error must not exceed + / - 0.5 mm;
Two sets of roller and the elevation error must not exceed 1 mm, the elevation of the same set of two wheel must agree, the tolerance should not be more than 0.1 mm; Two sets of roller transverse center error should not exceed + o. 3 mm; Wheel Angle should be according to the provisions of the drawings, the tolerance should not be more than 0.1 mm/m. Roller axis installation to ensure its same as the cylinder center line slope. Will be the same as the cylinder slope Angle gauge, back on On the roller, and then put the level Angle measuring gauge. Roller installed, put the dryer, with pressure lead to measure wheel and the roller ring contact, for further adjustment.
(5) supporting device meets the requirements, should be on the base is a sign of roller bearing center, after maintenance or sort of operation is as the basis.
(6) the anchor bolt hole grouting, base installation after the correction, for anchor bolt grouting, after waiting for concrete strength fully growth, just can twist the anchor bolt.
(7) the secondary grouting: between the base and foundation for the secondary grouting. Before grouting, fastening bolts, matter Angle iron, with the welding pad iron point in mind, but the base with the pad iron welding. To clean the base foundation, compacted grouting, there can be no clearance or honeycomb defect.