Correct installation steps of chicke
The correct installation of chicken manure dryer is the first step, but there is an important content after instal
The correct installation of chicken manure dryer is the first step, but there is an important content after installation that can not be ignored, that is debugging. As an experienced manufacturer of chicken manure dryer, dynnor company has carried out equipment debugging for thousands of customers. The following contents are summarized.
1. After the installation of the chicken manure dryer, first check the movement direction of the speed change device, confirm that the output sprocket turns correctly, then set the chain and adjust the center distance of the sprocket to make the chain tight.
2. Check whether the fan steering is in accordance with the regulations.
3. The trial operation of the fan must be carried out after it is combined with the hot air generator, otherwise the motor may be burnt.
4. Before the test run, add enough lubricating oil to each lubricating point, the lubricating oil shall be No. 20 engine oil, and the lubricating grease shall be sodium based grease, commonly known as high temperature milk.
5. Check the fastening condition of the connecting bolts and screws of each part, and check and adjust the clamping sprocket to make it in the normal working position.
6. Check and adjust the drying plate of each layer to make it turn over correctly without reverse phenomenon. Check and adjust the traction chain of drying plate of each layer and the traction chain of collector to make it in normal tightness state.
7. Complete the above preparation work, confirm that the chicken manure dryer is normal, and can be put into trial operation. In the trial operation, observe whether there is any abnormal situation again, and put into use after confirming that there is no error.
8. During the test run of the main engine, observe whether the drying plate on the upper leaf conveyor belt is in the middle. If there is a serious deviation to one side, it indicates that the installation of the oven has not reached the horizontal position, and it should be corrected again.
9. In the test run, adjust the speed control handwheel on the transmission, and operate slowly and quickly for one hour.
10. During hot test run, observe whether there is smoke leakage. If smoke leakage is found, carefully check the smoke leakage part of hot air generator and plug it.